Thursday, 5 January 2012

 


Shooting Schedule for Thriller Shoot

26th November 2011
Time.               Agenda.
9.00am                 Meet at the Horseshoe pub in Thurlby.
9.05am                 Walk to the shoot location.
9.15am                 Arrive at the set shooting location and set up equipment.
9.30am                 Start shooting footage (making sure we have at least 3 takes of each shot).
11.00am               Have a break to get some lunch look through footage at this point to see if we need to re-shoot any shots.
11.30am               Complete the second half of our shooting, re-shooting if necessary.
12.15pm               Pack all equipment away, check we have filmed all the shots we needed and check against the mark scheme.
27th November 2011
our thriller opening.

No comments:

Post a Comment